Grist Mill Bridge – Hampden, Maine (2020)
- Achieved a load test inventory rating factor of 1.66, surpassing the design target of 1.04.
- Demonstrated excellent deflection and fatigue resistance, meeting AASHTO standards.
- Instrumented by the University of Maine and UMass Lowell for performance validation.